Environmental consultants and engineering firms
Construction and cost consultants
Lenders ordering third-party reports
Site Intel takes your source materials and produces the full deliverable in your firm’s format, built to the standard your clients apply. Order reports per assignment or integrate our agents into your workflows.
Site Intel reads from the sources your reports are already built on: environmental database reports, historical aerials and topographic records, regulatory filings, parcel and ownership data, flood and mapping layers, and construction cost references. Records arrive the way they do today, and extraction and source-page citation happen automatically. Direct connections to specific providers, such as EDR, ERIS or FEMA, are built to client specification.
Phase I Environmental Site Assessment — ASTM E1527, recognized environmental conditions.
YOU RECEIVE
A complete, standards-compliant Phase I draft in your firm’s format, every figure traceable to its source page.
Order this report, or produce it with Vector Intel agents.
Includes:
Turnaround:
Typically 15–20 days manually; 1–2 days from data collection with Site Intel.
Senior review replaces senior drafting, so your firm turns more reports with the professionals you already have.
Nothing is released without expert validation, and every professional correction improves the platform for the next report.
Property Condition Assessment — ASTM E2018: condition, immediate repairs, reserves.
YOU RECEIVE
A complete PCA draft in your firm’s format, with condition findings, immediate repair costs and a reserve table.
Order this report, or produce it with Vector Intel agents.
Includes:
Turnaround:
Typically 10–12 days manually; 1–2 days from data collection with Site Intel.
One standard, one format and one method across every professional and every office.
Cost per report falls as production shifts from manual assembly to automated drafting.
Site Intel is built with a human-in-the-loop model by design. The bottleneck isn’t the fieldwork — it’s extracting the data and assembling the report. A property can be walked in a day; everything after it is manual. Those are the steps we automate.
One governed record per assignment, from field evidence through signed deliverable with no re-keying between steps — QA-gated before release. Client-specific intelligence with no data commingling.
Site Intel reads the public records, plans, photos and field notes and pulls the facts into one structured record — no manual keying, and every figure traces back to its source page.
Findings, cost tables, photo logs, boilerplate and section formatting are written straight into your firm's template as a complete, standards-compliant draft.
Your professionals own every finding, conclusion and cost table, and spend their hours on judgment rather than formatting. Nothing is released without expert validation.
Site Intel is built as one engine: construction diligence, lender site inspections and mobile field capture extend the same governed record into the work that follows closing.
Plan and Cost Review
Budget, plans and schedule reviewed before the first advance.
Construction Monitoring Report
Issued each draw period to document percent complete, budget adequacy, schedule status, stored materials, retainage and lien-waiver tracking — the record the lender relies on to fund each advance. In pilot production today with a leading national consulting firm.
On-demand and programmatic property inspections performed to a lender’s program requirements, at portfolio scale.
The site visit runs on a mobile app, not a clipboard: a scope-specific checklist preloaded with the property record, voice-enabled entry, and observations that sync straight into the drafted report.
Site Intel standardizes and automates report production so your firm turns more work product with the professionals you already have, with every finding validated by a qualified professional before release.